Critical path method
Related papers: 16
Top Researchers
Top Cited Papers
DAG Scheduling and Analysis on Multiprocessor Systems: Exploitation of Parallelism and Dependency
Shuai Zhao, Xiaotian Dai, Iain Bate, Alan Burns, Wanli Chang
Citations: 66 • 2020
A parametric critical path problem and an application for cyclic scheduling
Eugene Levner, Vladimir Kats
Citations: 64 • 1998
Path planning in nuclear facility decommissioning: Research status, challenges, and opportunities
Justina Onyinyechukwu Adibeli, Yong-kuo Liu, Abiodun Ayodeji, Ngbede Junior Awodi
Citations: 44 • 2021
Cyclic multiple-robot scheduling with time-window constraints using a critical path approach
David Alcaide López de Pablo, Chengbin Chu, Vladimir Kats, Eugene Levner, Gerard Sierksma
Citations: 33 • 2006
Project-oriented task scheduling for mobile robot team
Servet Hasgül, İnci Sarıçiçek, Metin Özkan, Osman Parlaktuna
Citations: 17 • 2009
GPU accelerated coverage path planning optimized for accuracy in robotic inspection applications
Randa Almadhoun, Tarek Taha, Lakmal Seneviratne, Jorge Dias, Guowei Cai
Citations: 12 • 2016
Path planning for material scheduling in Industrial Internet scenarios based on an improved RRT* algorithm
Yazhou Liu, Shuxian Zhu, Yaolong Yu, Zhengtian Wu
Citations: 8 • 2025
Performance evaluation of hyper-ledger fabric-based consensus mechanism on multi-robot path planning
Saurabh Jain, Rajesh Doriya
Citations: 5 • 2023
Design time stamp hardware unit supporting IEEE 1588 standard
Jae Won Park, Jin Ha Hwang, Won Young Chung, Seung-Woo Lee, Yong Surk Lee
Citations: 5 • 2011
Parallel algorithms and vlsi architectures for robotics and assembly scheduling
Po-Rong Chang, C. S. Lee
Citations: 5 • 1988
A FPGA-based Accelerator Implementation for Path Planning using Q_learning Algorithm
Xiaojuan Liu, Jietao Diao, Nan Li
Citations: 4 • 2022
An Accelerated Path Planning Approach
Esraa Morsi Ahmed, Hossam E. Abd El Munim, Hassan Bedour
Citations: 3 • 2018
On the Effect of Exploiting GPUs for a More Eco-Sustainable Lease of Life
Giuseppe Scanniello, Ugo Erra, Giuseppe Caggianese, Carmine Gravino
Citations: 3 • 2015
Just-in-Time Delivery Requires Just-in-Time Production X2 – Sychronising Factory and Site for Successful Prefabrication
Alan Mossman
Citations: 3 • 2019
Improving time and energy efficiency in multi-UAV coverage operations by optimizing the UAVs’ initial positions
Aliki Stefanopoulou, Emmanuel K. Raptis, Savvas Apostolidis, Socratis Gkelios, Athanasios Ch. Kapoutsis, Savvas A. Chatzichristofis, Stefanos Vrochidis, Elias B. Kosmatopoulos
Citations: 2 • 2024
Assembly project management of a suspended conveyor
Florin Blaga, Iulian Stǎnǎşel, A Pop, V Hule, Dan Crăciun
Citations: 2 • 2019