OTHER
A comparison of MTM and RTM
Chang-Bum Choi, W.H. Ip
- Year
- 1999
- Citations
- 10
Abstract
In recent years, high labour costs and the inconsistency of manual asembly have led to the wider acceptance of robotic assembly in product manufacturing. Planning robot assembly tasks requires a method of estimating robotic cycle time. Identifies some of the relationships between robot assembly time and manual assembly time, in order to develop a method of robot assembly time estimation based on manual assembly times. Uses methods time measurement (MTM) and robot time and motion (RTM) as the basis of comparison. Uses two case studies to evaluate the approach.
Keywords
Computer scienceRobotProduct (mathematics)Operations managementManufacturing engineeringArtificial intelligenceMathematicsEngineering
Related papers
OTHER
📊 26,957 cites
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
PERCEPTION
📊 22,245 cites
Artificial intelligence: a modern approach
1995
OTHER
Open access📊 20,501 cites
Fractional Differential Equations
Igor Podlubný
2025
OTHER
📊 18,993 cites
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991