OTHER
A comparison of MTM and RTM
Chang-Bum Choi, W.H. Ip
- 发表年份
- 1999
- 引用次数
- 10
摘要
In recent years, high labour costs and the inconsistency of manual asembly have led to the wider acceptance of robotic assembly in product manufacturing. Planning robot assembly tasks requires a method of estimating robotic cycle time. Identifies some of the relationships between robot assembly time and manual assembly time, in order to develop a method of robot assembly time estimation based on manual assembly times. Uses methods time measurement (MTM) and robot time and motion (RTM) as the basis of comparison. Uses two case studies to evaluate the approach.
关键词
Computer scienceRobotProduct (mathematics)Operations managementManufacturing engineeringArtificial intelligenceMathematicsEngineering
相关论文
OTHER
📊 26,957 引用
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
PERCEPTION
📊 22,245 引用
Artificial intelligence: a modern approach
1995
OTHER
开放获取📊 20,501 引用
Fractional Differential Equations
Igor Podlubný
2025
OTHER
📊 18,993 引用
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991