OTHER
Production-logistics cooperative scheduling in a two-stage assembly flow-shop with deteriorating robotic arm: a problem-specific heuristic
Wenyu Zhang, Zihao Luo, Shuai Zhang
- 发表年份
- 2026
- 引用次数
- 2
关键词
Job shop schedulingScheduling (production processes)HeuristicAutomationRobotConstraint (computer-aided design)Mobile robotFlexible manufacturing system
相关论文
OTHER
📊 26,957 引用
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
PERCEPTION
📊 22,245 引用
Artificial intelligence: a modern approach
1995
OTHER
开放获取📊 20,501 引用
Fractional Differential Equations
Igor Podlubný
2025
OTHER
📊 18,993 引用
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991