首页 /研究 /Peg-in-Hole Assembly Based on Two-phase Scheme and F/T Sensor for Dual-arm Robot
OTHER

Peg-in-Hole Assembly Based on Two-phase Scheme and F/T Sensor for Dual-arm Robot

Xianmin Zhang, Yanglong Zheng, Jun Ota, Yanjiang Huang

发表年份
2017
引用次数
38
访问权限
开放获取

摘要

This paper focuses on peg-in-hole assembly based on a two-phase scheme and force/torque sensor (F/T sensor) for a compliant dual-arm robot, the Baxter robot. The coordinated operations of human beings in assembly applications are applied to the behaviors of the robot. A two-phase assembly scheme is proposed to overcome the inaccurate positioning of the compliant dual-arm robot. The position and orientation of assembly pieces are adjusted respectively in an active compliant manner according to the forces and torques derived by a six degrees-of-freedom (6-DOF) F/T sensor. Experiments are conducted to verify the effectiveness and efficiency of the proposed assembly scheme. The performances of the dual-arm robot are consistent with those of human beings in the peg-in-hole assembly process. The peg and hole with 0.5 mm clearance for round pieces and square pieces can be assembled successfully.

关键词

RobotTorqueRobotic armScheme (mathematics)Dual (grammatical number)Position (finance)Orientation (vector space)SimulationComputer scienceEngineering

相关论文

查看 OTHER 分类全部论文