OTHER
Simulation and scheduling of AGV based robotic assembly systems
Andor Bálint Viharos, István Németh
- Year
- 2018
- Citations
- 21
Abstract
The paper presents a general discrete event simulation model developed in Siemens Plant Simulation software that controls AGVs in robotic assembly systems. All product assembly operations are inputs as graphs (trees). A methodology has been created that schedules the assembly operations on each workstation and schedules AGVs so that the overall manufacturing time is to be as short as possible. The system can control AGVs in real-time, handle arbitrary number and type of products and is prepared for stochastic events.
Keywords
Scheduling (production processes)WorkstationComputer scienceDiscrete event simulationSoftwareSiemensReal-time computingSimulationEngineeringOperating system
Related papers
OTHER
📊 26,957 cites
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
PERCEPTION
📊 22,245 cites
Artificial intelligence: a modern approach
1995
OTHER
Open access📊 20,501 cites
Fractional Differential Equations
Igor Podlubný
2025
OTHER
📊 18,993 cites
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991