首页 /研究 /Scheduling method of robotic cells with robot-collaborated process and residency constraints
MANIPULATION

Scheduling method of robotic cells with robot-collaborated process and residency constraints

Binghai Zhou, Ming Li

发表年份
2017
引用次数
9

摘要

As a typical NP-hard optimisation problem, the Robotic Cells Scheduling Problem (RCSP) concerning how to obtain the optimum sequence of robot activities widely exists in the fields of incorporate automation and repetitive processing. A RCSP with residency constraints and robot-collaborated process (RCP), where robots concurrently perform collaborated tasks (e.g. accurately readjust location, measure size and add reagent) in addition to part transportation, is presented in this paper. According to the constraints in real engineering practise, a non-linear programming model of single-gripper robotic cells is established to minimise the average manufacturing cycle time. A Tabu Circulatory Time Point (TCTP) searching algorithm is proposed on the basis of analyses. In addition, a lower bound (LB) on the average manufacturing cycle time is established. Finally, through extensive simulation experiments, the results indicate that the proposed algorithm can generate high-quality solutions.

关键词

AutomationTabu searchScheduling (production processes)RobotComputer scienceJob shop schedulingRoboticsProcess (computing)Mathematical optimizationEngineering

相关论文

查看 MANIPULATION 分类全部论文