The Impact of Time Delay on Construction Teleoperation Performance and Human-Robot Interaction in Space Construction

Youngjib Ham

Year
2023
Citations
2
Access
Open access

Abstract

With the development of construction robotics and cutting-edge technologies, the construction of sustainable habitats on the lunar surface has become a feasible goal. However, full automation technology and utilization of construction robots are limited, and collaboration with operators is inevitable in an uncertain and dangerous space construction environment. This paper studied the effect of communication delay on work performance, operator’s cognitive workload, and behavior change during construction teleoperation work. This study will contribute to understanding the operator's situation perception and behavioral changes and improving human-robot cooperation in space construction work when working on teleoperation under delayed conditions.

Keywords

TeleoperationWorkloadRobotRoboticsAutomationComputer scienceOperator (biology)PerceptionSpace (punctuation)Work (physics)

Related papers

Browse all HRI papers