BIM approach for decision support: case study fastening systems in factory adaptation planning
Lisa Lenz, Mike Gralla, Marvin Höpfner, Panagiotis Spyridis, Kai Christian Weist
- Year
- 2019
- Citations
- 5
- Access
- Open access
Abstract
Increasing and changing product requirements demand a permanent readiness for efficient factory adaption. Considering necessary construction adaptions as well as conventional construction planning processes in the context of the factory adaptation process, standard planning methods are unable to support in a fast and efficient way. By application of the BIM method a Building Information Model, which contains all the needed information in one database is generated. BIM is a method for achieving targets, such as selecting the right type of construction technology or building material to evaluate the adaptation measure. The challenges by putting all information in one model are dealing with the amounts of data, identifying data quality and determining the current use case which should be examined. In this publication, the necessary data base is identified and implemented into a Building Information Model to investigate the right fastening system for an Industry 4.0 case study. The use case describes an integration of a robot into a factory in the life cycle phase operation to evaluate, which fastening system is most suitable as a part of taking adaption intelligence of a building to a higher level.
Keywords
Related papers
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Artificial intelligence: a modern approach
1995
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991