Opportunistic scheduling for robotic assembly
B. R. Fox, Karl G. Kempf
- Year
- 2005
- Citations
- 95
Abstract
Impressive strides have been made in dealing with the spatial complexity of robotic assembly tasks. Unfortunately, advances in dealing with temporal complexity have not kept pace. It is proposed that one reason for this deficiency is the unnecessary confounding of planning and scheduling. These two activities are differentiated on the basis of knowledge required/knowledge available at robot programming time. It is suggested that giving the robot the ability to reason opportunistically over knowledge of part availability at run time is a practical, efficient way to streamline assembly tasks. Initial experimental results are presented to substantiate this conclusion.
Keywords
Related papers
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Artificial intelligence: a modern approach
1995
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991