Job shop scheduling

相关论文数: 20

最高引用论文

Bounds on Multiprocessing Timing Anomalies

Ron Graham

引用数: 2363 • 1969

A genetic algorithm for multiprocessor scheduling

E.S.H. Hou, Nirwan Ansari, Hongliang Ren

引用数: 685 • 1994

Constraint-directed search : a case study of job-shop scheduling

Mark S. Fox

引用数: 532 • 2018

Optimal Multirobot Path Planning on Graphs: Complete Algorithms and Effective Heuristics

Jingjin Yu, Steven M. LaValle

引用数: 342 • 2016

Fog Computing for Energy-Aware Load Balancing and Scheduling in Smart Factory

Jiafu Wan, Baotong Chen, Shiyong Wang, Min Xia, Di Li, Chengliang Liu

引用数: 323 • 2018

Sequencing of parts and robot moves in a robotic cell

Suresh Sethi, Chelliah Sriskandarajah, Gerhard Sorger, Jacek Błażewicz, Wiesław Kubiak

引用数: 296 • 1992

Scheduling analysis of time-constrained dual-armed cluster tools

Ja-Hee Kim, Tae‐Eog Lee, Hwan-Yong Lee, D.-J. Park

引用数: 275 • 2003

A Petri Net Method for Schedulability and Scheduling Problems in Single-Arm Cluster Tools With Wafer Residency Time Constraints

Naiqi Wu, Chengbin Chu, Feng Chu, Meng Zhou

引用数: 230 • 2008

Current trends in deterministic scheduling

Chung-Yee Lee, Lei Lei, Michael Pinedo

引用数: 219 • 1997

Modeling, Analysis and Control of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation Based on Petri Nets

Nai Qi Wu, MengChu Zhou

引用数: 209 • 2012

Cyclic scheduling in robotic flowshops

Yves Crama, Vladimir Kats, Joris van de Klundert, Eugene Levner

引用数: 196 • 2000

Cyclic Scheduling of Identical Parts in a Robotic Cell

Yves Crama, Joris van de Klundert

引用数: 187 • 1997

Yard crane and AGV scheduling in automated container terminal: A multi-robot task allocation framework

Xuchao Chen, Shiwei He, Yongxiang Zhang, Lu Tong, Pan Shang, Xuesong Zhou

引用数: 184 • 2020

Complexity of cyclic scheduling problems: A state-of-the-art survey

Eugene Levner, Vladimir Kats, David Alcaide López de Pablo, T.C.E. Cheng

引用数: 184 • 2010

A Closed-Form Solution for Schedulability and Optimal Scheduling of Dual-Arm Cluster Tools With Wafer Residency Time Constraint Based on Steady Schedule Analysis

Naiqi Wu, MengChu Zhou

引用数: 180 • 2009

Optimizing Makespan and Ergonomics in Integrating Collaborative Robots Into Manufacturing Processes

Margaret Pearce, Bilge Mutlu, Julie Shah, Robert G. Radwin

引用数: 172 • 2018

Fixed priority scheduling periodic tasks with varying execution priority

Michael González Harbour, Mark Klein, John P. Lehoczky

引用数: 168 • 2002

Balancing of assembly lines with collaborative robots

Christian Weckenborg, Karsten Kieckhäfer, Christoph Müller, Martin Grunewald, Thomas Spengler

引用数: 162 • 2019

Balancing and scheduling assembly lines with human-robot collaboration tasks

Amir Nourmohammadi, Masood Fathi, Amos H.C. Ng

引用数: 150 • 2021

An Extended Event Graph With Negative Places and Tokens for Time Window Constraints

Tae‐Eog Lee, Sanghoo Park

引用数: 150 • 2005