A model predictive control framework with customer-priority tiers for virtual power plant resilience during extreme weather: A UK heatwave case study

Edward Moroshko, Weizhe Qin, Desen Kirli, Mohammed Qais, Sotirios Tsaftaris, Aristides Kiprakis

发表年份
2025
访问权限
开放获取

摘要

Due to changes in frequency and intensity of extreme weather events, such as heatwaves and storms, power systems around the globe are having to deal with increased imbalance between demand and supply and additional risk of loss of supply, calling for advanced control strategies that strengthen system resilience. This paper develops a Model Predictive Control (MPC) framework for coordination of Virtual Power Plants (VPPs) that manages photovoltaic (PV) systems, batteries, and loads before, during, and after extreme weather events. A multi-objective mixed-integer quadratically constrained program is solved to enforce customer-priority tiers, serving critical loads first, while minimizing operating cost and PV curtailment under network and device constraints. Simulations on the IEEE 33-bus distribution network with real UK heatwave data show that, under realistic forecast errors and modeling uncertainties, MPC improves resilience by 11-20% relative to traditional full-horizon optimization. These results indicate the practical viability of receding-horizon coordination for resilient, low-carbon VPP operation during extreme weather.

关键词

eess.SY

相关论文

查看 OTHER 分类全部论文