Design of model predictive control considering time delay in remote excavation work
Hiromu Norizuki, Yutaka Uchimura
- Year
- 2018
- Citations
- 2
Abstract
In the teleoperation system with communication delay, the state of the remote robot arrives at the operator's side with time lag. Therefore, even though the remote robot has already been in contact with a obstacle, the operator may misunderstand that it is not in contact and may make further move. As a result, excessive force is applied to the obstacle and the remote robot may cause destruction and malfunction. In this paper, a teleoperation system using model predictive control is proposed to prevent destruction and failure due to time delay. The proposed method is evaluated by numerical simulations and experiments.
Keywords
Related papers
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Artificial intelligence: a modern approach
1995
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991
A new optimizer using particle swarm theory
R.C. Eberhart, James Kennedy
2002