Home /Research /Scheduling of two and three machine robotic cells with fuzzy methodology
OTHER

Scheduling of two and three machine robotic cells with fuzzy methodology

M.H. Fazel Zarandi, Mohammad Mehdi Fazel Zarandi, Yousef Maknoon, J. Masoumi

Year
2007
Citations
4

Abstract

Abstract This paper addresses the scheduling of robotic cells with two and three machines with fuzzy methodology. Some of the scheduling problems of these categories are transferred into a solvable traveling salesman problem that can be solved in a polynomial time. For generating the optimal part sequencing in the cells, the Gilmore and Gomory algorithm is modified and instead, a fuzzy Gilmore and Gomory algorithm is developed. Then, the proposed algorithm is tested and verified in a supplier company that produces part for an automobile industry. In any case, we compare the results of the proposed fuzzy method with those of crisp ones. The results show the superiority of the proposed algorithm in terms of flexibility, robustness, and reduction of cycle times.

Keywords

Computer scienceTravelling salesman problemMathematical optimizationFuzzy logicJob shop schedulingScheduling (production processes)Robustness (evolution)AlgorithmMathematicsArtificial intelligence

Related papers

Browse all OTHER papers