OTHER
ESTIMATING THE PRODUCTION TIMES IN PCB ASSEMBLY
Tero Laakso, Mika Johnsson, Tommi Johtela, Jouni Smed, Olli Nevalainen
- Year
- 2002
- Citations
- 10
Abstract
Several control problems of PCB assembly industry involve the estimation of the component placement times for various dierent placement robots. A standard approach, widely used in scientic literature, is to let the time to be a linear function of the number of components. In this paper, we demon-strate that a more realistic model should include additional parameters (e.g., the number of dierent component types and the board size). Linear mul-tiregression indicates that the coeÆcient of determination for the improved model is over 90 percent.
Keywords
Component (thermodynamics)Production (economics)Function (biology)MathematicsComputer sciencePhysics
Related papers
OTHER
📊 26,957 cites
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
PERCEPTION
📊 22,245 cites
Artificial intelligence: a modern approach
1995
OTHER
Open access📊 20,501 cites
Fractional Differential Equations
Igor Podlubný
2025
OTHER
📊 18,993 cites
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991