OTHER
ESTIMATING THE PRODUCTION TIMES IN PCB ASSEMBLY
Tero Laakso, Mika Johnsson, Tommi Johtela, Jouni Smed, Olli Nevalainen
- 发表年份
- 2002
- 引用次数
- 10
摘要
Several control problems of PCB assembly industry involve the estimation of the component placement times for various dierent placement robots. A standard approach, widely used in scientic literature, is to let the time to be a linear function of the number of components. In this paper, we demon-strate that a more realistic model should include additional parameters (e.g., the number of dierent component types and the board size). Linear mul-tiregression indicates that the coeÆcient of determination for the improved model is over 90 percent.
关键词
Component (thermodynamics)Production (economics)Function (biology)MathematicsComputer sciencePhysics
相关论文
OTHER
📊 26,957 引用
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
PERCEPTION
📊 22,245 引用
Artificial intelligence: a modern approach
1995
OTHER
开放获取📊 20,501 引用
Fractional Differential Equations
Igor Podlubný
2025
OTHER
📊 18,993 引用
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991