OTHER
<title>Control software and scheduling of the Liverpool Robotic Telescope</title>
I. A. Steele, D. Carter
- Year
- 1997
- Citations
- 14
Abstract
The Liverpool Telescope will be a fully robotic 2 m telescope situated in La Palma and managed from Liverpool John Moores University. The data flows between the robotic components of the telescope are discussed and the functionality of those components described. We pay particular attention to the design of the telescope scheduler. Using simulations we show that a relatively simple dispatch scheduler may be tuned to produce a schedule that has acceptable trade-offs between conflicting scheduling criteria.
Keywords
TelescopeSituatedScheduling (production processes)Control softwareSoftwareComputer scienceScheduleReal-time computingOperating systemEngineering
Related papers
OTHER
📊 26,957 cites
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
PERCEPTION
📊 22,245 cites
Artificial intelligence: a modern approach
1995
OTHER
Open access📊 20,501 cites
Fractional Differential Equations
Igor Podlubný
2025
OTHER
📊 18,993 cites
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991