首页 /研究 /<title>Control software and scheduling of the Liverpool Robotic Telescope</title>
OTHER

<title>Control software and scheduling of the Liverpool Robotic Telescope</title>

I. A. Steele, D. Carter

发表年份
1997
引用次数
14

摘要

The Liverpool Telescope will be a fully robotic 2 m telescope situated in La Palma and managed from Liverpool John Moores University. The data flows between the robotic components of the telescope are discussed and the functionality of those components described. We pay particular attention to the design of the telescope scheduler. Using simulations we show that a relatively simple dispatch scheduler may be tuned to produce a schedule that has acceptable trade-offs between conflicting scheduling criteria.

关键词

TelescopeSituatedScheduling (production processes)Control softwareSoftwareComputer scienceScheduleReal-time computingOperating systemEngineering

相关论文

查看 OTHER 分类全部论文