Optimal Scheduling of Timed Petri Nets With Resource Marking and Ready Times: Application to Robotic Flow Shops
Jun-Ho Lee, Hyun-Jung Kim
- 发表年份
- 2025
- 引用次数
- 4
摘要
Many scheduling problems, especially for automated manufacturing systems, have been addressed with a timed Petri net (TPN) by developing optimal or heuristic algorithms based on it. However, most of them have focused on cyclic scheduling, in which a firing sequence of transitions in a TPN is repeated, to minimize the cycle time. A few studies have considered a noncyclic scheduling problem but focused on developing a heuristic search method. In this study, a noncyclic scheduling problem for automated manufacturing systems is considered with a TPN to obtain an optimal solution with the makespan measure. Specifically, a scheduling problem of a dual-gripper robotic flow shop with a given job sequence is considered to determine an optimal robot task sequence. We first define resource marking and resource ready times for the dual-gripper robotic flow shop based on a TPN and develop dominance properties based on them. Then, an optimal algorithm that eliminates dominated nodes in a reachability tree by using those properties is proposed. The experimental results show that the proposed algorithm significantly outperforms the existing studies.
关键词
相关论文
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Artificial intelligence: a modern approach
1995
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991
A new optimizer using particle swarm theory
R.C. Eberhart, James Kennedy
2002