A Time-to-Boundary Margin for Transient Stability: Unifying Critical Clearing Time and Operating-Point Drift
Marián Mešter
- Year
- 2026
- Access
- Open access
Abstract
The loading margin to voltage collapse -- the distance in parameter space to the closest saddle-node bifurcation -- is a standard proximity index for voltage stability. This paper develops its transient-stability counterpart: a margin M that measures the time to the synchronism boundary rather than a distance, and that unifies two limits usually treated separately. The critical clearing time (CCT) is the fast, fixed-parameter limit; the slow drift of the operating point toward a static loadability limit is the other. M is defined as the first-passage time of the joint state-parameter motion to the survival boundary. We prove and verify that M equals the CCT exactly on the one-machine-infinite-bus reduction (deviation <= 0.01% across loadings on a published benchmark), establishing a certified single-machine pillar. Under operating-point drift, M yields an operational lead time before faults become unclearable; we take the 28 April 2025 Iberian blackout timeline as an illustrative time scale for the drift rate. On the New England 39-bus system, an independent benchmark, the single-machine-equivalent reduction reproduces the CCT within 1.8-6.0% (conservatively), and a critical slowing-down signature flags proximity to the boundary. For the multimachine case we characterize the limits explicitly: the transfer-conductance work is tightly boundable, while the controlling unstable equilibrium is the binding obstruction to a certified margin.
Keywords
Related papers
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991
Genetic Programming: On the Programming of Computers by Means of Natural Selection
John R. Koza
1992