Automation and Robotics of Underwater Concreting in Huge Scale Steel Caisson, The Main Tower Foundation of the Akashi Kaikyo Bridge
Santoshi Kashima, Takehisa Iho, Yoshitaka Nakagawa
- Year
- 1991
- Citations
- 2
Abstract
Automation and Robotics of Underwater Concreting in Huge Scale Steel Caisson, The Main Tower Foundation of the Akashi Kaikyo Bridge Santoshi Kashima, Takehisa Iho, Yoshitaka Nakagawa Pages 179-188 (1991 Proceedings of the 8th ISARC, Stuttgart, Germany, ISSN 2413-5844) Abstract: Antiwashout underwater concrete totalling about 500,000 meter cube in volume was placed for the two under water foundations of the Akashi Kaikyo bridge, to be the worlds longest suspension bridge when completed. Placing took a year under severe marine conditions with a maximum 8- knot tidal current and a maximum depth of 60 m. Because the concrete had to be placed in layers over the wide area of a steel caisson, which acts as the formwork, and under great depth, a cleaning robot to clean the undersea bedrock surface was used, production and placing of concrete was automated, and a construction joint treatment robot was used to obtain good quality concrete. Keywords: No keywords DOI: https://doi.org/10.22260/ISARC1991/0019 Download fulltext Download BibTex Download Endnote (RIS) TeX Import to Mendeley
Keywords
Related papers
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991
Are we ready for autonomous driving? The KITTI vision benchmark suite
Andreas Geiger, P Lenz, R. Urtasun
2012