Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint
Ada Che, Sihan Zhang, Yipei Zhang, Jianguang Feng
- Year
- 2023
- Citations
- 3
- Access
- Open access
Abstract
This article studies the speed-scaling robotic cell scheduling problem with constrained peak power consumption. The objective is to minimize cycle time and peak power consumption simultaneously. First, we formulate a bi-objective mixed integer programming model for the problem and propose a strategy to preprocess overlapping time windows. Then, we analyze the structural properties of the proposed model and develop an iterative $ \varepsilon $-constraint method to generate its complete Pareto front. Numerical experiments demonstrate that the proposed method effectively solves the robotic cell scheduling problem and that appropriate scheduling of speed-scaling machines can make a trade-off between productivity and power consumption.
Keywords
Related papers
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Artificial intelligence: a modern approach
1995
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991