首页 /研究 /Complexity Results for Flow-shop Scheduling Problems with Transportation Delays and a Single Robot
OTHER

Complexity Results for Flow-shop Scheduling Problems with Transportation Delays and a Single Robot

Ling Shi, Cheng Xue-guang

发表年份
2011
引用次数
2

摘要

The paper considers the problem of scheduling n jobs in a two-machine flow-shop to minimize the makespan. Between the completion of an operation and the beginning of the next operation of the same job, there is a time lag, which we refer to it as the transportation delays. All transportation delays have to be done by a single robot, which can perform at most one transportation at a time. New complexity results are derived for special case.

关键词

Job shop schedulingFlow shop schedulingScheduling (production processes)Computer scienceRobotReal-time computingOperations researchMathematical optimizationEngineeringArtificial intelligence

相关论文

查看 OTHER 分类全部论文