Just-in-Time Delivery Requires Just-in-Time Production X2 – Sychronising Factory and Site for Successful Prefabrication
Alan Mossman
- 发表年份
- 2019
- 引用次数
- 3
- 访问权限
- 开放获取
摘要
Failure to synchronize production on-site with production in the factory leads to losses for the client/owner, the Construction Manager/General Contractor (CM/GC) and subcontractors as well as to delays in the construction schedule. How can off-site fabrication of sub-assemblies be synchronised with predictable production and assembly on-site so as to increase the chances that the site is ready to receive each sub-assembly when it arrives and that site operations are not delayed by waiting for delivery of sub-assemblies? From the construction literature and the authors’ personal experiences it is clear that Critical Path Methods are not fit for this purpose; rigorous, collaborative, short-term planning is much more effective. Value for practitioners: ideas for what to pay attention to, in order to reduce both work waiting for workers (or robots) and workers (or robots) waiting for work. Value for scholars: ideas for further research.
关键词
相关论文
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Artificial intelligence: a modern approach
1995
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991