首页 /研究 /Current calculation methodology for manufacturing facilities with intermittent loads
OTHER

Current calculation methodology for manufacturing facilities with intermittent loads

F.S. Prabhakara, W.E. Kazibwe

发表年份
1992
引用次数
8

摘要

The authors present a direct probabilistic method of calculating thermal current ratings due to a large number of intermittent loads such as welders and robots. The welders and robots can have different currents and duty cycles and connect at different points on a distribution network that is not necessarily radial. Regular loads such as motor loads and other process loads can also be represented. The method can be easily extended to single-phase welders, i.e., for a three-phase distribution system analysis.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

关键词

RobotProcess (computing)Probabilistic logicPhase (matter)Computer scienceEngineeringReliability engineeringControl engineeringArtificial intelligencePhysics

相关论文

查看 OTHER 分类全部论文