Deadlock-free scheduling of flexible manufacturing workcells using automata theory
H.R. Golmakani, J.K. Mills, B. Benhabib
- 发表年份
- 2004
- 引用次数
- 9
摘要
This paper presents a novel method for the scheduling and control of flexible manufacturing cells (FMCs). The approach employs automata. Augmented by time labels proposed in the paper, for the modeling of machines, transportation devices, buffers, part types, precedence constraints, and part routes. The Ramadge-Wonham's supervisory-control theory is then used to synthesize a controller for the workcell representing its deadlock-free behaviour and capable of keeping track of time. For any given batch of parts to be processed by the FMC, a best-first (BF) graph-search strategy is subsequently employed to determine an optimal, or near-optimal, deadlock-free schedule using a novel heuristic function. The proposed approach is illustrated through a typical FMC example, adopted from [HH Xiong, M Zhou, and RJ Caudil IEE Conf. On Robotics and Automation, Albuquerque, USA, Vol. 3, pp. 2793-2797, 1996] to demonstrate the significant reduction in node generation.
关键词
相关论文
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Artificial intelligence: a modern approach
1995
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991