Generation Expansion Planning with Upstream Supply Chain Constraints on Materials, Manufacturing, and Deployment
Boyu Yao, Andrey Bernstein, Yury Dvorkin
- 发表年份
- 2025
- 访问权限
- 开放获取
摘要
Rising electricity demand underscores the need for secure and reliable generation expansion planning that accounts for upstream supply chain constraints. Traditional models often overlook limitations in materials, manufacturing capacity, lead times for deployment, and field availability, which can delay availability of planned resources and thus to threaten system reliability. This paper introduces a multi-stage supply chain-constrained generation expansion planning (SC-GEP) model that optimizes long-term investments while capturing material availability, production limits, spatial and temporal constraints, and material reuse from retired assets. A decomposition algorithm efficiently solves the resulting MILP. A Maryland case study shows that supply chain constraints shift technology choices, amplify deployment delays caused by lead times, and prompt earlier investment in shorter lead-time, low-material-intensity options. In the low-demand scenario, supply chain constraints raise investment costs by $1.2 billion. Under high demand, persistent generation and reserve shortfalls emerge, underscoring the need to integrate upstream constraints into long-term planning.
关键词
相关论文
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991
Genetic Programming: On the Programming of Computers by Means of Natural Selection
John R. Koza
1992