Control and Scheduling of Behind-the-Meter Battery Energy Storage Systems for Stacked Grid and Building Services
Nour-eddine Id omar, Alexandre Lê-Agopyan, Fabrizio Sossan
- 发表年份
- 2026
- 访问权限
- 开放获取
摘要
This paper proposes and experimentally validates a two-stage scheduling and control strategy for a behind-the-meter battery energy storage system (BESS) delivering both local and grid services. Considered services are the maximization of PV self-consumption, peak-load reduction, and secondary frequency control (aFRR).The day-ahead stage allocates battery capacity across local and balancing services using a scenario based approach, reflecting potential remuneration from aFRR participation without committing to fixed power availability; in the real-time stage, BESS set-points are computed in a periodic fashion at a high time resolution based on updated information on balancing prices, net load realization and BESS state of charge. The strategy is experimentally validated on a building at the Energypolis Campus of HES-SO Valais (Sion, Switzerland), which exhibits a peak power demand of 300 kW and is equipped with a 264 kWh / 140 kW lithium-ion BESS. The experimental results demonstrate the effectiveness of the proposed framework in scheduling and actuating the provision of both behind-the-meter and front-of-the-meter services.
关键词
相关论文
一种面向线弧增材制造的电动汽车结构可制造性拓扑优化的双环框架
Qiang Cui, Chuan Yu, Daoqian Yang 等 5 位作者
Robotics and Computer-Integrated Manufacturing · 2026
几何数字孪生:一种用于航空发动机装配精度预测的数字智能模型
Ke Shang, Xin Jin, Teli Xu 等 7 位作者
Robotics and Computer-Integrated Manufacturing · 2026
通过人工智能驱动的机器人技术革新产业
Aryan Chaudhary
Recent Advances in Computer Science and Communications · 2026
新型大口径偏置馈电可展开天线设计与动态性能预测
Chuang Shi, Tianming Liu, Ning Xue 等 9 位作者
Aerospace Science and Technology · 2026